CW-75- EPE Fruit Net Extrusion Line(Fully Automatic) Machine
Attn: Quotation NO.:FCQS-IN230316
Date:2023-03-16 From:sebastian
Quotation of CW-75- EPE Fruit Net Extrusion Line(Fully Automatic)
No. |
Equipment |
Q'ty |
Price |
1. |
CW-75 EPE Fruit Net Extrusion Line |
1 Set |
|
2. |
Necking foam system |
1 Set |
|
3. |
Auto feeding system for LDPE and Talc |
1 Set |
|
Total Amount FOB Qingdao Port Price |
|
1.General Information:
Raw material :LDPE,GMS,butane,talc
Extruder capacity:27-30kgs/hr
Production line speed:10-60m/min
Three shifts per day ,4 person for each shift.
Installed power:50kw
Power Supply:380V,50HZ ,3Phase.
2.List of maior system
name |
imagen |
Specifications |
Main Extruder(with auto feeding System) |
|
CW-75
- Necking Foam system
- Auto feeding system
|
Auto Temperature Control Cabinet |
|
Tianzheng Electric
|
Foaming agent injecting Unit |
|
Hangzhou Huali |
Anti-contractor injecting unit |
|
|
auto Net filter Changing system |
1 |
H13 Forging Hydraulic Automatic Screen Changing Unit, Hydraulic station |
Cooling Blower |
|
|
Haul off + Cutter
(main Control system) |
|
|
Mold |
|
4pcs
|
Mixer
|
|
1 set 2.2KW |
3.Detailed technical data:
A. Steel rack structure 1set
a.operation table of ingredient ss41 made of steel
b. steel ladder ss41 made of steel
B. Auto feeding unit 1set
capacity 250 kg/hr
feeding method auto feeding
hopper coniform
materials of hopper stainless steel
driving motor 1set 2HP ×4P
C.Extruding System 1set
a.Deceleration box 1set
model helical gear without pole
material FCD25 forgeable lion
box body FC 20
gear wheel SCM4 special gear wheel, Polished and heated
motor AC11KW×4P Pequipped with the transducer
b. Neck
model Cooling water set
material FCD25 (able to forge steel)
c.Barrel
diameter ∮75×∮140mm
material 38CrMoAl
heating area 10 sets
method of heating casted aluminum heater
method of cooling cycle water
diameter ∮75 (L/D-55:1)
MATERIAL 38CrMoAl
compression ratio 3:1
rotating speed 0-60 r/min
d.Screw
diameter ∮105 (L/D-55:1))
Material: 38CrMoALA nitride steel HV900
compression ratio 3:1
rotating speed 0-60 r/m
D.Vesicant injecting unit 1 set
forming agent butangas in liquid state
pump high pressure metering pump
output pressure highest Max 50 MPa
output regulation regulate the itinerary of piston
pressure panel 0-60MPa
power 2.2 kw
process control graduate hand wheel
driving motor by pump 2HP ×4P×1set
E. Anti-contractor injection unit 1 set
anti-cintroutor M-1, hard fatly acid single glycerine
pump high pressure measure pump, double pillarw piston
the range of measure ment 35-245CC/min
pressure panel 60Mpa 1set
volume of melting-pot 5-7L
driving motor by pump 1.5kw×4P
- Foaming mold head unit
Type round mold head for expanding
material 38CrMoAl
heating region 1zone
heating method electricity heater
fuse pressure panel 0-70Mpa
Fuse temperature T/M detector , 1 detecting site
- Auto net changing system
heating area 3 zones
L. Auto control unit 1 set
a.temperature control
squeezing engine 12 zones
mold head 1 zone
b. driving motor control
squeezing engine AC motor control cabinet
parts of haul and rolling control
4. Spare parts list:
No. |
Name |
Q'ty |
Remarks |
1. |
Butane pump connection with connecting set |
1 set |
|
2. |
special tools for taking spiral stick apart |
1 set |
|
3. |
Copper slice |
1 set |
|
4. |
stainless steel net |
1 m2 |
|
5. |
Plug sealing ring |
6 pcs |
Components easy to be damaged in butane pump
|
Heating pipe |
2 pcs |
Clip cover |
1 pc |
One way valve steel ball |
1 pc |
Sealing gasket (cuprum) |
1 pc |
One way valve seat |
1 pc |
6. |
Mould head heater |
2 sets |
|
7. |
Thermocouple |
2pcs |
|
8. |
Fuse high pressure panel |
1 pc |
|
9. |
M-1pipe heating line 3 pcs |
1 pcs |
|
10. |
One-way valve in squeezing engine |
1pc |
|
.Machine pic:
5.Consumption:
Item |
Consumption |
Remarks |
Water |
0.5-1 kgs/hr |
Water is recycling(for the machine cooling) |
Install power |
40 kw/hour |
|
Butangas |
0.2 L/min |
|
Electricity |
15kw/hour |
|
6. Equipment need to be prepared by customers
1. Buyer is responsible to guarantee the power and water supply to to make sure equipments and controlling cabinets can work normally.
2. All necessary craft pipelines (if you can provide your factory area, we can collocate the all pipelines free of charge) and valve, electric wires, cable, wire slots, bracket and so on.
7.Quotation:
1. Payment terms :40% down payment by T/T, 60% balanced by T/T before delivery
a. The expenses for the designation of the plane are included.
b. The seller will arrange 1 engineers to install&test the machine and train the buyer's engineers .The buyer should bear all the charges includes the internation&domestic round air ticket,hotel ,visa and all the expenses in the buyer's country .The buyer should pay each engineer USD60.00/day .
2 Delivery time :Within 30 days after the receipt of the down payment.
3.Package: Export standard package -steel iron frame .
4. Guaranty period :One year guaranty for the machine and 6 months for the electrial appliance .
5.Delivery:1x20'container
6.Validity :60 days
8.Final Product photo:
9.
Company Information